Infrastructure programmes fail on governance, not engineering.

Setting ownership and decision rights before the first contract is signed.

9 in 10megaprojects run over budget. Overruns of 50% are common.

Nine out of ten megaprojects have cost overruns. Overruns of up to 50% in real terms are common, and above 50% not uncommon. Benefit shortfalls follow the same pattern. Bent Flyvbjerg at Oxford summarises it as “over budget, over time, over and over again.”

The failures are rarely engineering failures. They are governance failures: unclear ownership, decision rights that shift with political cycles, and contracts signed before the operating model is settled.

We work with operators and agencies before the first contract is signed. We set decision rights, define what the programme must deliver in operating terms, and build the governance that survives a change of leadership. The aim is a programme that can be run, not only announced.

Discuss this with us

Tell us about the challenge. We reply within two business days.

Contact Taiga Advisory

More insights

Regulation

Regulatory change is now a recurring cost. Plan it like one.

Why compliance programmes should be run as operating capabilities, not projects.

Read more →
Operations

Most operating models were designed for a market that no longer exists.

A method for finding the three decisions that reset cost and capacity.

Read more →
Digital & Systems

The system is rarely the problem. The process around it is.

How to sequence systems work so the operation changes first and the software second.

Read more →